According to the requirements of Document GNKJ [2015] No.12 issued by National Energy Administration of the People’s Republic of China,“Notice on Releasing the Development and Revision Plan of the Second Batch ofEnergy Sector Standards in 2014”, and after extensive investigation andresearch, summarization of practical experience, and wide solicitation ofopinions, the drafting group has prepared this specification. The main technical contents of this specificationinclude: engineering geological investigation of reservoir bank protectionworks for hydropower projects at pre-feasibility study stage, resettlementplanning outline stage, resettlement planning report stage, and detailedconstruction drawing design stage.