您好,欢迎来到聚文网。 登录 免费注册
黄河小浪底水库水文泥沙规律研究

黄河小浪底水库水文泥沙规律研究

  • 字数: 432000
  • 装帧: 平装
  • 出版社: 黄河水利出版社
  • 作者: 李树森 等
  • 出版日期: 2019-11-01
  • 商品条码: 9787550925618
  • 版次: 1
  • 开本: 16开
  • 页数: 218
  • 出版年份: 2019
定价:¥68 销售价:登录后查看价格  ¥{{selectedSku?.salePrice}} 
库存: {{selectedSku?.stock}} 库存充足
{{item.title}}:
{{its.name}}
精选
内容简介
Xiaolangdi water conservancy project of the Yellow River is located in Xiaolangdi,Mengjin county,Luoyang city,Henan province,at the exit of the last Canyon in the middle reaches of the Yellow River to the north of Luoyang city,40 km away from Luoyang city in the south.Xiaolangdi Reservoir of the Yellow River is located in the lower part of the middle reaches of the Yellow River,130 km away from Sanmenxia water conservancy project on the top and 128 km away from Huayuankou,Zhengzhou,Henan Province on the bottom.
Xiaolangdi Reservoir of the Yellow River is a large-scale comprehensive water conservancy project on the main stream of the Yellow River,which integrates sediment reduction,flood control,ice prevention,water supply and irrigation,power generation,storage,clearing and discharge of muddy water,eliminating harm and promoting profit,and it is the key project for harnessing and developing the Yellow River.Xiaolangdi water conservancy project is one of the most complex water conservancy projects in the world,which has important strategic position,large-scale project,complex geological conditions,special water and sediment conditions and strict application requirements.It is the most challenging project.The control drainage area above the dam site of the reservoir is 694200 km2,accounting for 92.3% of the Yellow River drainage area.The flood control standard of Huayuankou in the lower reaches of the Yellow River has been raised from once in 60 years to once in 1 000 years,which basically relieves the threat of ice flood in the lower reaches of the Yellow River and slows down the deposition of the lower reaches of the river.Xiaolangdi is the only control project under Sanmenxia,the main stream of the Yellow River,which can obtain large storage capacity.It is in the key position of connecting the upstream and the downstream to control the water and sediment volume.
目录
《黄河小浪底水库水文泥沙规律研究:英文》目录参见目录图

蜀ICP备2024047804号

Copyright 版权所有 © jvwen.com 聚文网