Foreword 1 Scope 2 Normative References 3 General Principles 4 General Provisions 5 Installation of Turbine 6 Installation Work of Generator 7 Installation Work of Auxiliaries of Turbine-generator Unit 8 Commissioning of Hydraulic Turbine Generator Unit Appendix A(Informative Appendix) Tables for Quality Rating of Unit Work and Sub-work
摘要
1 Scope This Standard specifies methods for quality rating of unit work for installation of bulb tubular turbine generator unit and its auxiliary equipment in hydropower and water resources project. This Standard is applicable to the quality rating of bulb tubular turbine generator unit with unit capacity above 2MW (inclusive) and runner diameter above 2.5m (inclusive). For other types of bulb tubular turbine generator unit and those ones with unit capacity below 2MW and runner diameter below 2.5m, this Standard may serve as reference. ……