您好,欢迎来到聚文网。 登录 免费注册
水电水利工程施工测量规范 DL/T 5173-2003(英文版)

水电水利工程施工测量规范 DL/T 5173-2003(英文版)

  • 出版社: 中国电力出版社
  • 作者: 中华人民共和国国家经济贸易委员会 分布
  • 出版日期: 2008-05-01
  • 商品条码: 9787508367859
  • 版次: 0
  • 开本: 大32开
  • 页数: 0
  • 出版年份: 2008
定价:¥55 销售价:登录后查看价格  ¥{{selectedSku?.salePrice}} 
库存: {{selectedSku?.stock}} 库存充足
{{item.title}}:
{{its.name}}
精选
目录
Foreword 1 Scope 2 Normative Reference 3 General 4 Terms and Definition 5 Plane Control Survey   5.1 General rules   5.2 Technical design   5.3 Point selection, embedment and survey marks of plane control network   5.4 Horizontal angle observation   5.5 Electro-optical distance survey   5.6 Global positioning system (GPS) survey   5.7 Result check and adjustment calculation   5.8 Maintenance and management of plane control network 6 Elevation Control Survey   6.1 General rules   6.2 Technical requirements for leveling survey   6.3 Trigonometric traverse leveling with electro-optical ranging   6.4 River-crossing trigonometric leveling with electro-optical ranging..   6.5 Fieldwork result processing and adjustment calculation 7 Topographic Survey   7.1 General rules   7.2 Mapping base control survey   7.3 Requirements for topographic map surveying and mapping   7.4 Digitized mapping   7.5 Underwater topographic survey 8 Preparation of Setting-out Survey   8.1 General rules   8.2 Survey data collection and setting-out plan preparation   8.3 Setting-out data processing   8.4 Selection of setting-out methods and setting-out station   8.5 Inspection of instrument and survey apparatus 9 Excavation, Filling and Concrete Construction Survey   9.1 General rules   9.2 Excavation survey   9.3 Survey of filling and concrete construction   9.4 Setting-out point checking   9.5 Section survey and construction quantity calculation   9.6 Data processing 10 Metal Structure and Electro-mechanical Equipment Installation Survey   10.1 General rules   10.2 Survey and mapping of specific installation control network,installation axis point and elevation basic point   10.3 Setting out of installation points 10.4 Check of installation setting-out points   10.5 Data processing 11 Underground Works Survey   11.1 General rules   11.2 Control survey outside tunnel   11.3 Control survey inside tunnel   11.4 Construction setting out and section survey   11.5 Data processing 12 Dredging Works, Canal and Dyke Survey   12.1 Dredging works survey   12.2 Canal and dyke survey   12.3 Data processing 13 Ancillary Works Survey   13.1 General rules   13.2 Survey of screening, mixing and belt conveyor feeding systems ~   13.3 Survey of cable-crane, tower-crane and bridge-crane   13.4 Cofferdam and embankment dyke construction survey   13.5 Data processing 14 Deformation Monitoring During Construction Period   14.1 General rules   14.2 Point selection and embedment   14.3 Horizontal displacement observation   14.4 Vertical displacement observation   14.5 Calculation and data processing 15 Construction Completion Survey   15.1 General rules   15.2 Earth-rock excavation and filling works   15.3 Concrete works   15.4 Metal structure and electro-mechanical equipment installation works   15.5 Data processing 16 Data Compilation

蜀ICP备2024047804号

Copyright 版权所有 © jvwen.com 聚文网