Part one Preliminary Works(前期工程)
Unit 1 Project Synopsis(2E程简介)
Unit 2 Construction Method Statement(施工方案会审)
Unit 3 Tender Document and Contracts(标书与合同)
Unit 4 Access to the Site(进场)
Part two Construction of Main Frame(主体结构施工)
Unit 5 Construction of Underground Works(基础工程施工)
Unit 6 Formwork(模板工程)
Unit 7 Reinforcement Works(钢筋工程)
Unit 8 Concrete Works(混凝土工程)
Unit 9 Inspection of Safety(安全检查)
Unit 10 Quality Control(质量控制)
Unit 11 Roofing Works(屋面工程)
Part three Final—stage Works(后期工程)
Unit 12 Apparatus Works(设备工程)
Unit 13 Ornamental(Decoration)Works(装饰工程)
Part four Acceptance of Finished Works(竣工验收)
Unit 14 Acceptance of Finished Works(竣工验收)
Glossary(词汇表)