前言
Item 1 Case Study in Aircraft General (Chapter 5-12)(For the Fixed-wing Aircraft)
★Learning Objectives
★Item Guide
★Item Preparation
★Aviation Listening & Speaking
Task 1 Tow the Airplanes With Flat Tires(TASK 09-11-04-580-801 P/B 200)
Task 2 Rudder Bonding Strap HIRF/Lightning Inspection (TASK 05-55-08-200-801 P/B 600)
★Warning Case Study
★Career Simulation Test
Item 2 Case Study in Aircraft Systems (Chapter 20-49)(For the Fixed-wing Aircraft)
★Learning Objectives
★Item Guide
★Item Preparation
★Aviation Listening & Speaking
Task 3 Flap/Slat Electronics Unit (FSEU) Installation (TASK 27-51-01-400-801 P/B 400)
Task 4 Pitot Probe Cleaning (TASK 34-11-01-100-801 P/B 700)
★Warning Case Study
★Career Simulation Test
Item 3 Case Study in Aircraft Structures (Chapter 51-57)(For the Fixed-wing Aircraft)
★Learning Objectives
★Item Guide
★Item Preparation
★Aviation Listening & Speaking
Task 5 Fixed Trailing Edge Upper Panel - Adjustment/Test (TASK 57-50-01-820-801 P/B 500)
Task 6 Lightning Diverter Strip Temporary Repair (TASK 53-52-03-300-801 P/B 800)
★Warning Case Study
★Career Simulation Test
Item 4 Case Study in Propeller/Rotor (Chapter 60-67)(For Rotorcraft Only)
★Learning Objectives
★Item Guide
★Item Preparation
★Aviation Listening & Speaking
Task 7 Removal of Rotor Blades (TASK 62-10)
Task 8 Installation of Main Rotor Gearbox Assembly (TASK 63-20)
★ Warning Case Study
★ Career Simulation Test
Item 5 Case Study in the Powerplant (Chapter 70-80)(For the Fixed-wing Aircraft)
★Learning Objectives
★Item Guide
★Item Preparation
★Aviation Listening & Speaking
Task 9 Start the Engine Procedure (Engine Cross Bleed Start) (TASK 71-00-00-800-810-F00 P/B 200) / 142
Task 10 MMEL 74-1 (DDPG) Preparation - Right Ignition System Inoperative(TASK 74-00-00-040-801-F00 P/B 900)
★Warning Case Study
★Career Simulation Test
APPENDIX I Supplementary PP Tasks (For Fixed-wing Air-craft)
Item 1 Case Study in Aircraft General (Chapter 5-12)
Task 1 Flush the APU Oil (TASK 12-13-31-610-802)
Task 2 Wire Bundle Inspection - Right Wheel Well (TASK 05-55-26-200-802)
Item 2 Case Study in Aircraft System (Chapter 20-49)
Task 3 Control Stand Floodlight - Lamp Replacement (TASK 33-14-00-960-802)
Task 4 Electrical Connector and Terminal Inspection (TASK 49-11-01-200-802)
Item 3 Case Study in Aircraft Structures (Chapter 51-57)
Task 5 Open the Galley Service Door With the Interior Handle (TASK 52-41-00-860-803)
Task 6 Nose Radome Removal (TASK 53-52-00-000-801)
Item 5 Case Study in the Powerplant (Chapter 70-80)
Task 9 Chip Detector Access/Pressure Relief Door Free Play Adjustment(TASK 71-11-07-820-802-F00)
Task 10 Engine Start Brake Switch Installation (TASK 76-11-11-420-801-F00)
APPENDIX II PP Tasks (For Rotorcraft)
Item 1 Case Study in Aircraft General (Chapter 5-12)
Task 1 Parking in High Wind or Turbulent Air (TASK 10-11)
Task 2 Chip Detector and Sight Gage (TASK 12-13)
Item 2 Case Study in Aircraft System (Chapter 20-49)
Task 3 Fuel Quality Sender (TASK 28-21)
Task 4 Navigation Light (TASK 33-21)
Item 3 Case Study in Aircraft Structures (Chapter 51-57)
Task 5 Empennage Assembly (TASK 53-50)
Task 6 Vertical Stabilizer (TASK 53-51)
Item 4 Case Study in Propeller/Rotor (Chapter 60-67)
Task 7 Input Shaft Seal Replacement (TASK 65-42)
Task 8 Tail Rotor Controls (TASK 67-50)
Item 5 Case Study in the Powerplant (Chapter 70-80)
Task 9 FCU Fuel Cutoff Control Rigging (TASK 76-12)
Task 10 Fuel Quantity Gage (TASK 95-35)
APPENDIX III Comparison of ATA 100 Chapters in English & Chinese
REFERENCE